Message Board Thread - "Substation repair criteria"

Back to Threads | Back to Forums

TitleByPosted On
Substation repair criteria PdM Joe 5/29/2009
I would like to know of any ones experience with either NFPA 70B and EPRI’s prioritization criteria for critical Substation equipment given all variables are equal (emisivity, loading, wind, distance ect..). What has been your failure rates, and if you have changed criteria why. Also if you have developed your our criteria what is it & why? Thanks Joe
 


  • Back to Threads
  • Back to Forums

     

  •   Copyright © FLIR Systems, Inc 2012